Network Flow based approaches for the
Pipelines Routing Problem in Naval Design

 and  Víctor Blanco, Gabriel González, Yolanda Hinojosa,
Diego Ponce,Miguel A. Pozo, Justo Puerto
Institute of Mathematics (IMAG) and Dpt Quant. Methods Economics & Business, Universidad de Granada
Institute of Mathematics (IMUS) and Dpt. Applied Economics I, Universidad de Sevilla
Institute of Mathematics (IMUS) and Dpt. Stats & OR, Universidad de Sevilla
Abstract.

In this paper we propose a general methodology for the optimal automatic routing of spatial pipelines motivated by a recent collaboration with Ghenova, a leading Naval Engineering company. We provide a minimum cost multicommodity network flow based model for the problem incorporating all the technical requirements for a feasible pipeline routing. A branch-and-cut approach is designed and different matheuristic algorithms are derived for solving efficiently the problem. We report the results of a battery of computational experiments to assess the problem performance as well as a case study of a real-world naval instance provided by our partner company.

Key words and phrases:
Pipeline Routing, Network Design, Branch-and-Cut, Matheuristics, Naval Engineering.

1. Introduction

The design and construction of ships is a complex procedure that starts with a concept design phase. In the concept design, all the necessary ship construction requirements are determined, in order to meet the client needs. Next, in the basic design phase of the ship structure, piping and electrical circuits are defined and all the different equipment are adequately selected. In this phase, one of the most difficult tasks is to determine the pipeline route design in which one has to determine the paths of the different services attending to a series of technical requirements. Pipeline routing requires the coordination of different elements of the ship, as the routing of electrical circuits, water pipes and optical fiber, the prevention of traversing forbidden obstacles, the assuredness of the adequate space for handling the machinery, among many others, all of them having to guarantee the compatibility and the manufacturability technical requirements. Although there are some available tools to help the designers on this task, the difficulty of the problem makes that an expert is still necessary to guide the design to a desired final product. Usually, there are some specifications regarding the number of main lines, branches to be connected to the main lines, valves, etcetera that have to be considered (see e.g. [Cuervas et al., 2017]). Once the initial technical requirements are determined, the pipeline routing problem must be solved following these specifications. The main limitations of the pipeline routing problem on a ship can be classified in three types (see [Ando and Kimura, 2011, Park, 2002, Qian et al., 2008]):

Physical Constraints::

The path followed by the pipelines must avoid physical obstacles and connect with the adequate equipment.

Operational Constraints::

The routes must consider accessibility for handling equipment and valves slackness for security. In addition, some zones in the decision space are more desirable than others, as bottom spaces in a cabin that may be used for storing other types of materials.

Economic Constraints::

There is a limited budget both for the material and workforce cost. Thus, it is necessary to reduce the pipe lengths, as well as the use of elbows in the design.

Some of the above mentioned requirements must be imposed to design feasible routes, while others can be quantified and reflected in a cost function in order to evaluate the different feasible alternatives and decide the most favorable. Nevertheless, defining adequately such a function implies including elements of different nature as material and workforce costs, use of elbows, routes passing through preference zones and holes, etc.

There exist a few software tools (as AVEVA, FORAN or SMART3D, among others) that may help industrial designers for the development of this work. However, even those tools that incorporate some automatic routing functionality are still limited to consider all the technical requirements of this real-world problem being them more adequate for industrial plants. Furthermore, the underlying algorithms of these modules do not allow to incorporate the different specificities for the design of a ship, and then, in most cases the solution is not valid for the naval designer. In other cases, the decision aid tools are extremely specialized, not being flexible enough for the design of networks of different characteristics.

The goal of this paper is to derive an efficient mathematical programming based methodology for the automatic design of pipeline routes that take into account the different technical specificities of a naval design, but still flexible enough to be adapted to different situations and constructibility criteria that appear in real-world situations as the one that motivated this study.

Automatic pipeline routing has been already addressed in the literature (see for instance, [Guiradello and Swaney, 2005, Kimura, 2011, Min et al., 2020, Park and Storch, 2002, Singh and Cheng, 2021]). One of the most crucial steps in this problem is the description of the set of feasible routes for the pipes. Although the problem is initially stated in a continuous framework, with routes that are allowed to be traced in a continuous three-dimensional region, the mathematical problem is intractable in this form (one would need to locate a set of complex three-dimensional paths on a continuous space). Thus, a discretization of the whole space into a finite set of feasible routes is needed also because the tractability of the problem and the simplicity of the obtained routes. One of the possible options is to discretize the space by cell decomposition. In [Lee, 1961] the author proposed to subdivide the region into squared cells and those containing obstacles are removed. Several authors have used that scheme to derive algorithms for solving shortest path problems in continuous regions [Hightower, 1969, Mitsuta et al., 1986, Rourke, 1975, Schmidt-Traub et al., 1999]. This approach has been also adapted to solve the pipeline routing problem [Ando and Kimura, 2011, Asmara, 2013, Asmara and Nienhuis, 2006, Kim et al., 2013, Zhu and Latombe, 1991]. However, this method requires a high number of cells in the subdivision to get accurate solutions of the problem. To overcome this situation, one may also discretize the space by means of a graph structure [Guiradello and Swaney, 2005, Newell, 1973, Shing and Hu, 1986]. Both approaches, cell subdivision and graph generation can be also adequately combined to derive efficient approaches in pipeline routing [Park and Storch, 2002].

Once the space is adequately discretized, there are several heuristic approaches that have been proposed to solve the pipeline routing problem. Most of them are genetic algorithms [Ikehira et al., 2005, Ito, 1999, Kimura, 2011] or ant colony algorithms [Xiaoning et al., 2006, Xiaoning et al., 2007].

In this paper we will consider a graph-based discretization of the space that allows us to use Combinatorial Optimization tools for efficiently solving the problem. The graph is generated taking into account the shape of the region and obstacles, the positions of the source and destination points of the pipes, the size of the pipelines, the preferred zones and penetrable zones (holes through which some obstacles can be traversed), and other characteristics of the pipes to route. Firstly, we generate the nodes of the graph using highlighted points (source and destination points, corners, holes, …) and also intermediate points by means of a grid with a desired width. Secondly, we define the edges of the graph by linking the close-enough nodes. Finally, each edge is provided with a set of weights (one for each pipeline to route) representing the different costs of using it in a path.

On the basis of this idea our main contributions are:

  1. (1)

    We discretize the continuous three-dimensional space by using a graph-based framework that allows searching for pipeline routes taking into account the obstacles and the use of elbows in the routes.

  2. (2)

    We propose a multicommodity network flow based model for the problem that incorporates the different physical and operational limitations of the routing. In particular, the minimum allowed distances between consecutive elbows and separation between services. We provide a particular branch-and-cut approach for the problem.

  3. (3)

    We propose a flexible assessment function to evaluate feasible routes that take into account the different specificities that appear in real-world naval design: length of the paths, preference zones, closeness to ceilings/floors, use of elbows, crossing penetrable zones, etc.

  4. (4)

    We develop different matheuristic algorithms able to solve realistic instances of the problem in reasonable CPU times.

To present our contribution we have organized the paper in six sections. Section 2 describes the main elements involved in the pipeline routing problem and their mathematical representation. Section 3 is devoted to present the mathematical programming model that we propose for solving the pipeline routing problem imposing naval design technical requirements. In Section 3.1 a branch-and-cut method is proposed in order to incorporate complicating constraints as they are required, instead of considering, initially, all of them. Two families of matheuristic algorithms are provided in Section 4 to solve large-sized instances. In Section 5 we report the results of our computational experiments. There, we also include a case study based on real data provided by our industrial partner. Finally, we derive some conclusions and future lines of research is Section 6. We have included an Appendix to gather all the pseudocodes that describe the details of our algorithms.

2. The Pipeline Routing Problem in Naval Design

The goal of this paper is to model and solve the problem of how to route different pipelines on a ship competing for a reduced space taking into account the adequate technical requirements. In what follows we describe the main elements of the problem: input data, feasible actions and assessment of a particular solution.

We assume that the underlined region where the pipelines are to be routed is represented by a bounded polyhedron, 𝒫0\mathcal{P}_{0}, in 3\mathbb{R}^{3}. In real-world situations, the polyhedron is usually a cuboid in the form 𝒫0=[a1,a2]×[b1,b2]×[c1,c2]\mathcal{P}_{0}=[a_{1},a_{2}]\times[b_{1},b_{2}]\times[c_{1},c_{2}], representing a cabin in the ship. We are also given a finite set of regions O1,,Oo𝒫0O_{1},\ldots,O_{o}\subseteq\mathcal{P}_{0} that represents oo obstacles that cannot be traversed by a pipeline route. For the sake of simplicity, these regions will be also identified with cuboids. Thus, the three-dimensional region where the pipelines are allowed to be traced is 𝒫=𝒫0\=1oO\mathcal{P}=\mathcal{P}_{0}\backslash\cup_{\ell=1}^{o}O_{\ell}. In addition, we are given a finite set of services (cylindrical pipelines) each of them represented by the coordinates of a source and a destination point (both in 𝒫\mathcal{P}), a radius (of the cylindrical pipeline), and a safety minimum allowed distance with respect to other services. Our approach can be easily adapted to other shapes of pipelines, as parallelepipeds (with rectangular sections).

The main decision to be taken in this problem is to determine the set of (dimensional) paths in 𝒫\mathcal{P} that each one of the services must follow. Initially, a feasible path for a service will be a continuous union of segments in 𝒫\mathcal{P} starting off from its source point and reaching its destination point. In addition, a minimum required distance must be ensured between two consecutive breakpoints (elbows) by constructibility reasons. Furthermore, once a feasible path for each service is traced, and once a dimensional pipeline is traced around the path, one has to ensure that a minimum required distance between the different services is respected. In particular, the pipelines are not allowed to cross or to overlap in a solution.

The quality of a suitable solution of the problem, given by a set of feasible paths, is evaluated with respect to different criteria. Apart from the length, which is proportional to costs, one also looks for paths with small number of elbows, close to the ceiling of the region or traversing pre-specified preference zones.

In what follows we describe the mathematical representation of the elements involved in the Pipeline Routing Problem in a Ship (PRPS) that we analyze.

In order to discretize the continuous space 𝒫\mathcal{P}, first, an orthogonal 3D grid is built on the big parallelepiped 𝒫0\mathcal{P}_{0}, assuring that source and destination points of each service are nodes of the grid and that they are connected with other nodes of the grid. This grid defines a baseline undirected graph to which nodes and edges intersecting regions OO_{\ell}, for =1,,o\ell=1,\ldots,o, are removed. In Example 1 we show a simple instace for the problem.

Example 1.

In order to illustrate the procedure described in the paper we include an example of a scenario with an obstacle and three services (see Figure 1 (left)). The scenario is a box with dimensions 6×6×46\times 6\times 4 with an interior obstacle (box) of dimensions 2×2×42\times 2\times 4 located in the center of the box representing a pillar. The discretized space of solutions is given by a three-dimensional orthogonal grid from which the corresponding portion that is within the obstacle has been removed (see Figure 1 (right)).

Refer to caption
Figure 1. Illustration of the first discretization phase of a PRPS instance with an obstacle and three services with sources and destinations at the blue and red points, respectively. The left figure shows the origin and destination points and the obstacle. The right figure depicts the grid of the discretized space.

However, when tracing a path in such a graph, one is not able to detect or penalize the use of elbows. Elbows in a pipeline must be adequately identified in its route both because constructibility and also because routes with a smaller number of elbows are preferred. The goal is to obtain a mathematical programming model for the problem that avoids non-linearities. In order to consider elbows in a linear objective function in our model, we modify the initial graph by exploiting the nodes of the graph as follows:

  1. (1)

    Each physical node vv in the initial graph is replaced by an exploited node, i.e., a set of three virtual nodes, vX,vY,vZv_{X},v_{Y},v_{Z} with the same 3D coordinates than vv, one for each direction of the canonical basis of 3\mathbb{R}^{3} (X, Y and Z).

  2. (2)

    Virtual nodes associated to the same physical node are linked through the so-called virtual edges. Their lengths are zero (since they link nodes with the same coordinates), but they will have a positive cost representing the usage of an elbow in the route.

  3. (3)

    Each physical edge in the initial graph is replaced by another edge with the same length as the physical one, where instead of joining two physical nodes, it connects two virtual nodes (associated to the same physical end nodes of the original edge). Specifically, each edge is linked to the virtual nodes identified with its direction. In this way, edges parallel to the X-axis link XX-virtual nodes, edges parallel to the Y-axis link YY-virtual nodes, and edges parallel to the Z-axis link ZZ-virtual nodes.

In Figure 2 we show an illustration of this explosion of nodes. In the left picture we show a crossing node, vv, which is linked in the graph to other six nodes. In the right picture we show the three exploited nodes, vXv_{X}, vYv_{Y} and vZv_{Z}, of node vv. Node vXv_{X} (resp. vYv_{Y}, vZv_{Z}) is linked only to the two adjacent nodes which are linked with edges parallel to the XX-axis (resp. YY-axis, ZZ-axis) and with the others two virtual nodes associated with the same physical node. As we can see, the three virtual edges linking vXv_{X} with vYv_{Y}, vXv_{X} with vZv_{Z} and vYv_{Y} with vZv_{Z} are drawn with dashed lines in this picture.

vv
vXv_{X}vZv_{Z}vYv_{Y}vXv_{X}vZv_{Z}vYv_{Y}
Figure 2. Illustration of exploited nodes and virtual edges

In Figure 3 we illustrate the use of this graph to model different types of turns in a path. In the left picture, to go from aa to bb no elbows are used and a single exploited node (vYv_{Y}) is used. On the other hand, in the center (resp. right) picture, turning from an edge parallel to YY-axis towards an edge parallel to ZZ-axis (resp. XX-axis) requires traversing the virtual edge (vY,vZ)(v_{Y},v_{Z}) (resp. (vY,vX)(v_{Y},v_{X})) incurring in a cost for using that elbow. The result is a graph representing the feasible space where routing the pipelines.

aabbvYv_{Y}vZv_{Z}vXv_{X}aabb
aabbvYv_{Y}vZv_{Z}vXv_{X}aabb
aabbvYv_{Y}vZv_{Z}vXv_{X}aabb
Figure 3. Illustration of the use of exploited nodes and virtual edges to model different types of turns in a path from node aa to node bb

We denote by G~=(V,E)\widetilde{G}=(V,E) the graph constructed as described above where VV is the set of (virtual) nodes and EE the set of edges. Set EE includes the set of virtual edges, denoted by EvE^{v}, and the replicas of the physical initial edges. Since G~\widetilde{G} is embedded in 3\mathbb{R}^{3}, each node vVv\in V is also identified with its 3D3D coordinates, (xv,yv,zv)3(x_{v},y_{v},z_{v})\in\mathbb{R}^{3}. We denote by dvv=d((xv,yv,zv),(xv,yv,zv))d_{vv^{\prime}}=d((x_{v},y_{v},z_{v}),(x_{v^{\prime}},y_{v^{\prime}},z_{v^{\prime}})) the Euclidean distance between nodes v,vVv,{v^{\prime}}\in V and by deed_{ee^{\prime}} the Euclidean distance between the edges e,eEe,e^{\prime}\in E (representing either, a point in 3\mathbb{R}^{3} if eEve\in E^{v} or a segment in 3\mathbb{R}^{3} if eEEve\in E\setminus E^{v}).

We assume that we are given a finite set of commodities, KK, each of them requiring its own pipeline to determine the design of its route. Each commodity kKk\in K is defined by a pair (sk,tk)(s^{k},t^{k}) where skVs^{k}\in V is the source of the commodity and tkVt^{k}\in V is the destination of the commodity. Depending on the commodity kKk\in K, a cost structure, cek0c_{e}^{k}\geq 0 for each eEe\in E, is defined over the edges of the graph. These costs depend on many factors as for instance, the length of the edges, the elbow costs, the preferences of the designer when routing the pipelines, etc. A detailed cost structure will be described in Section 5.2 for the case study we deal with in this work.

3. A multicommodity network flow based model

In this section we describe the mathematical programming model that we propose for solving the PRPS imposing naval design technical requirements. In a first approximation, one can model the problem as a minimum cost multicommodity network flow problem (MCMNFP, for short). Let us denote by G=(V,A)G=(V,A) (where A={(i,j)(j,i):e={i,j}E}A=\{(i,j)\cup(j,i):\ e=\{i,j\}\in E\} is the arc set) the directed version of the graph G~\widetilde{G} described in the previous section. Similar to the non-directed version, we assume that set AA includes the set of virtual arcs, denoted by AvA^{v}, and the replicas of the physical arcs. We also denote by daad_{aa^{\prime}} the Euclidean distance between the arcs a,aAa,a^{\prime}\in A (notice that daa=0d_{aa^{\prime}}=0 if aa and aa^{\prime} are the arcs corresponding to the two opposite directions of the same edge). In addition, we assume that, for each commodity kKk\in K, the cost of each arc (i,j)A(i,j)\in A is cijk=cjik=cekc_{ij}^{k}=c_{ji}^{k}=c_{e}^{k}, where e={i,j}e=\{i,j\}.

The goal of MCMNFP is to route jointly all the commodities in KK from their respective sources, sks^{k}, to their destinations, tkt^{k}, through the network GG at minimum cost. This model has been widely studied in the literature (the interested reader is referred to [Salimifard and Bigharaz, 2020] and the references therein for further details on the MCMNFP).

In order to describe the mathematical programming model for the MCMNFP, we use the following set of binary decision variables:

xijk={1if arc (i,j) is used by the route of commodity k,0otherwise.x_{ij}^{k}=\left\{\begin{array}[]{cl}1&\mbox{if arc $(i,j)$ is used by the route of commodity $k$},\\ 0&\mbox{otherwise.}\end{array}\right.

With this set of variables, the overall cost of routing the commodities through the network can be expressed as:

(i,j)AkKcijkxijk.\sum_{(i,j)\in A}\sum_{k\in K}c^{k}_{ij}x^{k}_{ij}.

The following set of linear constraints ensures the correct representation of the problem:

kKjV:(i,j)Axijk1,\displaystyle\sum_{k\in K}\sum_{j\in V:(i,j)\in A}x_{ij}^{k}\leq 1, iV,\displaystyle\forall i\in V, (MCMNFP1{\rm MCMNFP}_{1})
jV:(i,j)AxijkjV:(i,j)Axjik=0,\displaystyle\sum_{j\in V:(i,j)\in A}x_{ij}^{k}-\sum_{j\in V:(i,j)\in A}x_{ji}^{k}=0, kK,iV(isk,tk),\displaystyle\forall k\in K,i\in V(i\neq s^{k},t^{k}), (MCMNFP2{\rm MCMNFP}_{2})
jV:(sk,j)Axskjk=1,\displaystyle\sum_{j\in V:(s^{k},j)\in A}x^{k}_{s^{k}j}=1, kK,\displaystyle\forall k\in K, (MCMNFP3{\rm MCMNFP}_{3})
jV:(j,tk)Axjtkk=1,\displaystyle\sum_{j\in V:(j,t^{k})\in A}x^{k}_{jt^{k}}=1, kK,\displaystyle\forall k\in K, (MCMNFP4{\rm MCMNFP}_{4})
xijk{0,1},\displaystyle x_{ij}^{k}\in\{0,1\}, (i,j)A,kK.\displaystyle\forall(i,j)\in A,k\in K. (MCMNFP5{\rm MCMNFP}_{5})

where (MCMNFP1{\rm MCMNFP}_{1}) assures that only one commodity is routed through a node and in particular, through an arc, (MCMNFP2{\rm MCMNFP}_{2})-(MCMNFP4{\rm MCMNFP}_{4}) are the flow conservation constraints and (MCMNFP5{\rm MCMNFP}_{5}) is the domain of the variables.

Refer to caption
Figure 4. Solution of a MCMNFP in the underlined graph without additional modelling constraints (left) and the final solution after adding the additional constraints on distances between services and elbow test (right)

The solution of MCMNFP is a set of paths (one for each commodity) connecting sources with destinations that do not overlap on the graph GG. The reader may observe that in the graph GG each physical node has been replaced by three virtual nodes on the same coordinates. This explains that in Figure 4 (left) some paths occupy the same space although they do not actually overlap on GG.

This problem is known to be 𝒩𝒫\mathcal{NP}-hard, even for the case of two commodities (see [Even et al., 1975]). Additionally, in pipeline routing there are two main technical requirement that must be considered in order to construct feasible designs: a minimum distance between the pipelines and a minimum distance between consecutive elbows in a single pipeline. The first requirement allows to adequately separate the different services to be used by the pipelines (and such that, when they are enlarged to represent dimensional pipes, they fit on the space) as well as to keep space for the manipulation of machinery in the ship cabins. The second one, is a physical limitation of pipeline routing since there is not enough space for a pipe to turn twice in case consecutive elbows are positioned too close. Note that solutions consists of segments in 3\mathbb{R}^{3} with no dimensionality and therefore, these considerations are not taken into account in the MCMNFP. Thus, to impose those technical requirements the following constraints must be added to the problem in order to adequately model the PRPS:

  1. (1)

    Distance between Services:

    Given an (non-virtual) active edge for a service kk, a minimum distance with respect to other services is required. Let RkR^{k} be the radius of the cylinder of pipeline kKk\in K and let Δk\Delta^{k} be the minimum security distance from kk to any other element. Then, the minimum distance allowed between services kk and kk^{\prime} is Rkk=Rk+Rk+max{Δk,Δk}R^{kk^{\prime}}=R^{k}+R^{k^{\prime}}+\max\{\Delta^{k},\Delta^{k^{\prime}}\}.

    This requirement is assured imposing the following set of constraints:

    kK:kkaAdaa<RkkxakMak(1xak),\displaystyle\sum_{k^{\prime}\in K:k^{\prime}\neq k}\sum_{\begin{subarray}{c}a^{\prime}\in A\\ d_{aa^{\prime}}<R^{kk^{\prime}}\end{subarray}}x_{a^{\prime}}^{k^{\prime}}\leq M_{a}^{k}(1-x_{a}^{k}), aAAv,kK,\displaystyle\forall a\in A\setminus A^{v},k\in K, (Dist{\rm Dist})

    that is, if aa is an active arc in the path of service kk, then, no arc in the path of any other service kkk^{\prime}\neq k can be activated at a distance smaller than the minimum required. Here, fixed aAAva\in A\setminus A^{v} and kKk\in K, MakM_{a}^{k} is a big enough constant (greater than 2(|K|1)2(|K|-1) times the number of the grid edges contained in the cuboid centered at midpoint of arc aa and with edge length length(a)+ 2maxkkRkklength(a)+\,2\max_{k^{\prime}\neq k}R^{kk^{\prime}}).

  2. (2)

    Elbow Test:

    A feasible path for a service, kKk\in K, is required to verify a minimum distance between consecutive elbows, Dk0D^{k}\geq 0, of this single service. Since elbows are identified in the non-directed graph with virtual edges and then, with virtual arcs in the directed graph, this requirement can be incorporated to the model as follows:

    xak+xak1,\displaystyle x_{a}^{k}+x_{a^{\prime}}^{k}\leq 1, a,aAv:daaDk,aa,kK,\displaystyle\forall a,a^{\prime}\in A^{v}:d_{aa^{\prime}}\leq D^{k},a\neq a^{\prime},k\in K, (Elbow{\rm Elbow})

    that is, if two different virtual arcs (elbows) of the same service kKk\in K are at a distance smaller than or equal to DkD^{k}, then only one of them is allowed to be active.

    Example 2 shows the effects of considering constraints (Dist{\rm Dist}) and (Elbow{\rm Elbow}).

    Example 2 (Example 1 - continuation).

    Let (N,E)(N,E) be the grid depicted in Figure 1 (right). Grid (N,E)(N,E) is a simplification of the actual graph G=(V,A)G=(V,A) used to solve the problem because in the final graph a directed version is considered and each of the nodes in the grid is replaced by its explosion as explained in Section 2.

    We have solved the Example 1 scenario with the multicommodity model with and without the additional modelling constraints (𝐷𝑖𝑠𝑡{\rm Dist}) and (𝐸𝑙𝑏𝑜𝑤{\rm Elbow}). Observe that the paths without additional modelling constraints do not respect the conditions about distances and thus a much shorter solution is provided (see Figure 4 (left)) than in the case in which the technical requirements imposed by means of constraints (𝐷𝑖𝑠𝑡{\rm Dist}) and (𝐸𝑙𝑏𝑜𝑤{\rm Elbow}) have to be fulfilled (see Figure 4 (right)).

    Figure 5 shows the final solution with dimensional pipelines of the given pre-specified radii.

    Refer to caption
    Figure 5. A graphical display of the solution of Example 1 with the final pipelines of the three services and their actual radii

    Note that constraints (Elbow{\rm Elbow}) can be reinforced as follows. Given a virtual arc aAva\in A^{v}, we denote by RE(a)={a~Av:a~ has the same coordinates as a}RE(a)=\{\tilde{a}\in A^{v}:\tilde{a}\mbox{ has the same coordinates as }a\}, namely the set of arcs linking virtual nodes associated to the same physical node as the one linked by aa. Clearly, if daaDkd_{aa^{\prime}}\leq D^{k}, all the arcs in RE(a)RE(a) and RE(a)RE(a^{\prime}) are incompatible and then cannot take simultaneously a value of 11. Thus,

    a~RE(a)xa~k+a¯RE(a)xa¯k1,\displaystyle\sum_{\tilde{a}\in RE(a)}x_{\tilde{a}}^{k}+\sum_{\bar{a}\in RE(a^{\prime})}x_{\bar{a}}^{k}\leq 1, a,aAv:daaDk,aa,kK.\displaystyle\forall a,a^{\prime}\in A^{v}:d_{aa^{\prime}}\leq D^{k},a\neq a^{\prime},k\in K. (ElbowR{\rm Elbow-R})

With the above considerations, the PRPS can be formulated as:

min\displaystyle\min (i,j)AkKcijkxijk\displaystyle\sum_{(i,j)\in A}\sum_{k\in K}c^{k}_{ij}x^{k}_{ij} (PRPS{\rm PRPS})
s.t. (MCMNFP1)(MCMNFP5),\displaystyle\eqref{mcf:1}-{\eqref{mcf:5}},
(Dist),(-ElbowR).\displaystyle\eqref{mcf:6},{\eqref{mcf:8}}.

Problem (PRPS{\rm PRPS}) is a minimum cost multicommodity network flow problem with additional constraints that enforce the fulfillment of the technical requirements for the pipelines in the solution. Although the problem is modeled as an Integer Linear Programming Problem, in real-world situations it has a large number of variables (𝒪(|A||K|)\mathcal{O}(|A||K|)) and a large number of constraints. In particular, the technical constraints (Dist{\rm Dist}) and (ElbowR{\rm Elbow-R}) place a considerable load on the model (𝒪(|A|2|K|)\mathcal{O}(|A|^{2}|K|)).

3.1. An exact solution method for (PRPS{\rm PRPS})

The large dimensions of our model makes the straightforward approach of putting it into a MIP solver not possible even for small-sized instances. We overcome this drawback using a branch-and-cut method that incorporates the constraints as they are required, instead of considering initially all of them. This strategy allows an efficient exact solution approach of the problem by means of solving an incomplete (relaxed) formulation with only some of the constraints in the model, while the remaining constraints, required to assure the feasibility of the solutions, are incorporated on-the-fly as needed. Although in the worst case situation, the procedure may need all the constraints not initially included, in practice, only a small number of them are added, reducing considerably the size of the problem.

Specifically, we consider, in the beginning, the relaxed master problem (1):

min\displaystyle\min (i,j)AkKcijkxijk\displaystyle\sum_{(i,j)\in A}\sum_{k\in K}c^{k}_{ij}x^{k}_{ij} (MCMNFP{\rm MCMNFP})
s.t. (MCMNFP1)(MCMNFP5).\displaystyle\eqref{mcf:1}-{\eqref{mcf:5}}.

The above problem is nothing but the multicommodity network flow model that does not consider the two families of technical constraints that are required for a feasible solution of our problem. Thus, when solving (MCMNFP{\rm MCMNFP}), one may obtain solutions which do not satisfy constraints (Dist{\rm Dist}) and/or (ElbowR{\rm Elbow-R}). Therefore, each obtained solution must be checked for feasibility. To separate the violated constraints, we apply an enumerative procedure and those which are violated are added to the pool so that the problem is solved again (cutting off the previously obtained solution).

More specifically, for a given solution of the relaxed master problem, we check whether it violates (Dist{\rm Dist}) and/or (ElbowR{\rm Elbow-R}) as follows:

  • To check the violation of any of the constraints in (Dist{\rm Dist}) we proceed by measuring the distance between two arcs from different commodities in the solution or the distance between an arc from a commodity in the solution and obstacles’ edges. If the distance measured is smaller than the sum of the radius of both commodities plus the security distance between them, the constraint is violated. In case it is violated for a service kKk\in K and aAAva\in A\setminus A^{v}, the constraint is added to the constraint pool of the master problem.

  • The violation of the constraints (ElbowR{\rm Elbow-R}) is tested by first ordering virtual arcs within each commodity in the path given by the current solution and then measuring the distance between two consecutive virtual arcs in the path. If the distance measured is smaller than the minimum required distance between elbows for this commodity then the constraint is violated. In this case, this particular constraint (in its reinforced version) is introduced as a feasibility cut to the set of constraints of the problem.

For a more efficient implementation of the procedure, it is embedded in the branch-and-bound tree by means of lazy cuts, resulting in a branch-and-cut strategy for solving the problem.

4. Two matheuristic algorithms for the PRPS{\rm PRPS}

In order to solve the pipeline routing model PRPS{\rm PRPS} presented in Section 3 one has to solve a MILP problem. However, in most cases of real-world situations, due to their large number of variables and constraints, the corresponding problem cannot be solved by a commercial solver (and in many cases it cannot be even loaded). For this reason, we provide in this section two families of matheuristic algorithms for the problem based on two different paradigms: reducing the dimension of the MILP model and decomposing the problem into simpler problems. The pseudocode of both algorithms is included in A.

4.1. Dimensionality Reduction

Recall that we assume that the underlined region where the pipelines are to be routed is represented by a bounded polyhedron in 3\mathbb{R}^{3}, and that in real-world situations, the polyhedron is usually a cuboid representing a cabin in the ship where some other smaller cuboids (obstacles) have been removed. In addition, there are zones of such a region that are rarely used by the paths in the solutions (by all or some of the services). We exploit this fact in order to reduce the number of variables of our model.

Refer to caption
Figure 6. Illustration of the initial region used in the dimensionality reduction algorithm

We propose an iterative procedure that starts by considering some tentative areas as candidate zones for searching for the solution (called in the pseudocode Init-Sol) and then solving the multicommodity flow problem with additional (ElbowR{\rm Elbow-R}) constraints for each single commodity to determine the best solution for each service independently of the remainder services. Then, for each commodity we consider a parallelepiped of a given initial dimension around the obtained path and instead of solving (PRPS{\rm PRPS}) in the whole graph, we solve the problem in the union of these parallelepipeds together with the initial candidate zones (see Figure 6 (right)). We do this by fixing to zero the variables indicating arcs outside the above mentioned regions. In case the problem is feasible, it provides a solution of (PRPS{\rm PRPS}). Otherwise, the dimension of the parallelepipeds is increased and the procedure is repeated until feasibility is obtained. Although in the worst case situation the algorithm requires solving the original instance of the problem (the whole graph), in practice, it allows to solve the problem with a considerably smaller number of variables. Algorithm 1 in A.1 provides a pseudocode for this procedure.

4.2. Decomposition-based algorithms

Note that when removing the capacity constraints, (MCMNFP1{\rm MCMNFP}_{1}), from MCMNFP, the problem can be decomposed in |K||K| single-commodity network flow problems with unitary demands which are equivalent to solve |K||K| shortest path problems on the undirected graph G~\widetilde{G}, and then, solvable in 𝒪(|V|2+|E|)\mathcal{O}(|V|^{2}+|E|) time by the classical Dijkstra algorithm [Dijkstra, 1959]. Based on this idea, we propose an algorithm that exploits the use of this decomposition for solving fast and accurately the PRPS. Algorithm 2 in A.2 shows the pseudocode of this algorithm.

First, the algorithm considers a sorted list of all the commodities (pipelines to route), K0K_{0}, and a maximum number of iterations to perform, maxit. The iterations are grouped in three different classes: parallel iterations (I_par), sequential iterations (I_seq) and cluster iterations (I_cluster), such that the three sets define a partition of {1,,maxit}\{1,\ldots,maxit\}.

The main scheme for all the iterations is similar. At each iteration it{1,,maxit}it\in\{1,\ldots,maxit\}, a shortest path is built for each commodity included in the sorted list KitK_{it} trying to pass the elbow test, i.e., the minimum required distance between consecutive elbows in the paths (constraints (Elbow{\rm Elbow})). This path is constructed using the procedure SPP_Pipe_Elbow_Test (Algorithm 3 in A.2). In this procedure, for each commodity kKitk\in K_{it}, a shortest path from the source node sks^{k} to the destination node tkt^{k} is initially built on the undirected graph G~\widetilde{G} using Dijkstra algorithm (SPP(sktk)\mathrm{SPP}(s^{k}\rightarrow t^{k})). In case the elbow test is passed, SPP_Pipe_Elbow_Test returns that path. Otherwise, the part of the path that passes the test is kept, the cost of the first elbow that does not pass the test is increased and Dijkstra algorithm is run again (with the new costs) from the last elbow passing the test to the destination node (updating the source node for SPP\mathrm{SPP}). The process is repeated every time we find an elbow that does not pass the test. If we identify the process is cycling we initialize it maintaining the increased costs and taking the source node of the commodity as destination node and viceversa. This last step is repeated until the elbow test is passed or until a maximum number of iterations (of the elbow test) is reached and then, the elbow test has not been passed.

The second step consists of avoiding overlapping of paths in the solution. This phase is different for each of the types of iterations that we consider. In the sequential iterations paths for commodities are solved one by one in the sorted order and therefore, the sorting of the commodities affects the solution. In these iterations, once the path for commodity kk is solved, this path is kept, commodity kk is removed from the list of sorted commodities and overlapping is avoided by increasing for the remaining services kkk^{\prime}\neq k in the list, the cost of the edges in conflict, that is, the edges at a distance lower or equal than Rk+ΔkR^{k}+\Delta^{k} from the edges used in the path of service kk. They can be tested using Algorithm 4 described in A.2.

In the parallel iterations the paths for commodities are solved independently and the overlapping phase is addressed once all the paths are constructed by increasing the cost of the edges in conflict. In the cluster iterations, paths for all the commodities are solved initially in parallel. The commodities that do not overlap with any other are removed from the set of commodities KitK_{it} and their paths are kept. The remainder commodities kKitk\in K_{it} are organized in clusters of services with edges in conflict and they are sorted by some prefixed measure, as for instance, increasing length of their paths. The first sorted commodity of each cluster is removed for the set of commodities KitK_{it} and their path is kept. The cost of the edges in conflict with the paths that are kept is increased for the commodities remaining in KitK_{it} and these commodities are solved in parallel. The process is repeated until Kit=K_{it}=\emptyset or until the maximum number of iterations is reached.

Note that, for all types of iterations, each iteration is performed with a new set of costs for the edges, trying to avoid the use of conflicting edges in the solutions for the next iteration.

5. Computational experience

Next, we report on the results of some computational experiments that we have run, in order to compare empirically the proposed exact and heuristic approaches.

5.1. Random instances

The set of random instances are generated as follows. We choose 𝒫0\mathcal{P}_{0} as a cube of edge length equal to 128 units. An orthogonal 3D grid of d×d×dd\times d\times d physical nodes, with d{17,33}d\in\{17,33\} is built on this cube, being the distance between adjacent nodes fixed to 128d1\frac{128}{d-1} units. This means a spacing of 8 and 4 units for d=17d=17 and d=33d=33, respectively. We will call dd the density of the grid.

Five different groups of 15 obstacles each are generated with cube shape and edge length l=10l=10 units. Each coordinate of the center of an obstacle is placed in [ε+l2,128εl2][\varepsilon+\frac{l}{2},128-\varepsilon-\frac{l}{2}] where ε\varepsilon stands for the width of an obstacles-free layer along the facets of 𝒫0\mathcal{P}_{0} that ensures some feasible origin-destination paths in case too many obstacles are placed. This grid defines a baseline for the undirected graph G~\widetilde{G} described in Section 2 and the directed version GG described in Section 3.

Five different groups of 1212 services are generated with equal radius of 4 units and establishing a safety minimum allowed distance of 1 unit with respect to other services. For each service, a source and a destination have been randomly generated belonging to planes y=0y=0 (for the source) and y=128y=128 (for the destination) assuring that both points are nodes of the grid for d=17d=17 and therefore, for d=33d=33.

Several details on real-life cost functions for our problem are given in Section 5.2. However, for this preliminary study on random instances, we choose the cost function coefficients for an edge ee as:

cek=α1k(de+10Ele+2Che),c_{e}^{k}=\alpha_{1}^{k}(d_{e}+10El_{e}+2Ch_{e}),

where:

  • α1k\alpha^{k}_{1} takes random integer values in [1,9][1,9].

  • ded_{e} is the physical distance between the two end-nodes ii and jj of the edge e={i,j}e=\{i,j\} (length of the edge).

  • EleEl_{e} takes value 1 if edge ee represents an elbow and 0 otherwise.

  • CheCh_{e} takes value 1 if edge ee is a vertical edge (in the ZZ-axis) and 0 otherwise.

Observe that the cost function considers the distance of the paths, the number of elbows introduced as well as changes in height. This cost system is a simplified version of the general cost function described in Section 5.2 for our case study.

We denote by (d,s,o,g)(d,s,o,g) the instance of density d{17,33}d\in\{17,33\}, services {1,2,,s}\{1,2,...,s\} with s{5,8,12}s\in\{5,8,12\}, obstacles {1,2,,o}\{1,2,...,o\} with o{5,10,15}o\in\{5,10,15\} and creating five instances, g{1,,5}g\in\{1,\ldots,5\}, for each combination of services and obstacles. Therefore 90 different benchmark instances are generated.

All instances were solved with the Gurobi 7.7 optimizer, under a Windows 10 environment in an Intel(R) Core(TM)i7 CPU 2.93 GHz processor and 16 GB RAM. Default values were initially used for all parameters of Gurobi solver and a CPU time limit of 7200 seconds was set. We have also tested different combinations of parameters for the solver cut strategy and dimensionality reduction heuristic but, unless it is specified, the best results were obtained with the parameters of the solver set to the default values. An initial solution was given to the problem by solving the multicommodity flow problem with additional (ElbowR{\rm Elbow-R}) constraints for each service independently of the remainder services.

For the decomposition based heuristic, we fix the maximum number of iterations to 2020, the first 10%10\% of them of type I_par, the next 80%80\% of type I_cluster and the last 10%10\% of type I_seq. In case a feasible solution is not found with the maximum number of iterations (which only happens for some of the d=33d=33 instances), we generate the solution for the same instance by reducing the density to d=17d=17, which is indeed, a feasible solution of the instance.

In Table 1 we report the average results of our computational experiments. The first three columns indicate the parameters identifying the instances, dd (density), ss (number of services) and oo (number of obstacles). For each of the combinations of these parameters we report the average results of the five generated instances. Column Vars indicates the number of variables of the (MCMNFP) problem and column Cons the number of constraints. Column Solved reports the number of instances out of five solved to optimality by the Exact method (Ex). In the block of columns denoted by GAP we report the gap obtained with the three proposed procedures, the Exact (Ex) model, the dimensionality reduction algorithm (H1), based on trimming down instances, and the one based on decomposing the problem (H2). The GAP reported for the exact approach indicates the MIP gap obtained at the end of the time limit in case the problem has not been optimally solved, while the gap for the heuristic procedures gives the percent deviation of the heuristic solution with respect to the best solution obtained with the exact approach. Finally, in the block of columns Time we report the CPU time required by each one of the approaches.

A first analysis of the results shows that the exact algorithm solves all instances with d=17d=17 and any number of services and obstacles, whereas for d=33d=33 we could solve to optimality almost all the instances for number of services s=5s=5 and 88 but not for s=12s=12 services. Actually, for s=12s=12 services none of the instances could be solved to optimality within the time limit although the final MIP gap is always very small and less than or equal to 1.48%1.48\%.

On the other hand, the results reported for the heuristic algorithms are rather good. For all the instances our two heuristic approaches (H1) and (H2) always find feasible solutions and the gaps with respect to the best solution found by the exact method (Ex) are less than or equal to 5.73%5.73\%. Actually, heuristic (H2) reports even better gaps being always less than or equal to 1.59%1.59\%.

Concerning running times, as expected, the methods based on solving mathematical programming models, i.e., the exact method (Ex) and the matheuristic (H1), require more time to get to their solutions. Clearly, (H1) is less time consuming than (Ex) since it solves trimmed instances which results in programs with much less variables and constraints so that the computing time is also smaller. On the other hand, the decomposition heuristic (H2) which is based on iteratively solving shortest path problems with modified weights is much lighter and the running times are considerably smaller.

GAP Time d s o Vars Cons Solved Ex H1 H2 Ex H1 H2 17 5 5 228,232 73,572 5 0.00 0.10 0.00 11.15 6.26 1.28 10 227,421 73,386 5 0.00 0.32 0.00 11.51 7.80 1.48 15 226,736 73,230 5 0.00 2.01 0.00 12.21 9.73 1.40 8 5 399,406 117,761 5 0.00 0.31 0.64 400.17 396.38 2.24 10 397,986 117,463 5 0.00 1.96 0.22 339.85 240.53 4.37 15 396,788 117,214 5 0.00 5.73 0.34 347.41 482.09 4.59 12 5 627,638 176,735 5 0.00 0.61 1.59 4216.11 1824.99 3.78 10 625,407 176,289 5 0.00 2.64 1.17 3367.94 2159.86 7.20 15 623,524 175,914 5 0.00 4.93 1.26 2596.96 2215.58 7.55 17 417,015 122,396 45 0.00 2.07 0.58 1225.45 1149.25 3.77 33 5 5 1,694,166 537,852 5 0.00 0.10 0.00 163.20 3.31 98.08 10 1,689,282 536,568 5 0.00 0.16 0.00 152.31 5.43 90.72 15 1,684,880 535,407 5 0.00 0.69 0.00 176.34 9.82 98.66 8 5 2,964,791 860,609 3 0.06 0.24 0.64 5100.74 62.58 183.93 10 2,956,243 858,554 4 0.16 1.26 0.15 4393.18 247.27 181.27 15 2,948,540 856,697 4 0.16 3.07 0.32 3484.85 1546.39 184.73 12 5 4,658,958 1,291,007 0 1.26 0.45 1.59 7200.05 236.02 315.66 10 4,645,524 1,287,926 0 1.48 1.32 1.17 7200.05 1214.57 311.04 15 4,633,420 1,285,139 0 1.38 3.68 1.26 7200.05 4278.22 308.63 33 3,097,312 894,418 26 0.50 1.22 0.57 3896.75 844.85 196.97 Total 1,757,163 508,407 71 0.25 1.64 0.57 2576.11 997.05 100.37

Table 1. Computational results for random instances

5.2. Case study

This section is devoted to present the application of the proposed methodology to one of the realistic instances provided by our partner Ghenova in order to show the actual applicability of our solution methods to solve scenarios that appear in naval design.

Refer to caption
Figure 7. Scenario of the case study

In what follows we describe the elements involved in the instance analyzed in this section, which is drawn in Figure 7:

  • The space to design the pipelines systems consists of the three-dimensional parallelepiped with widths 5732,28365732,2836 and 20132013 units (in the XX, YY and ZZ axis, respectively) which represent a ship cabin.

  • A grid was generated for the cabin by subdividing each axis in segments of width 100100, producing an initial grid of 58×29×2158\times 29\times 21 nodes. The graph G~=(V,E)\tilde{G}=(V,E) is generated by introducing virtual nodes and edges, with |V|=73407|V|=73407 and |E|=282202|E|=282202.

  • Ten services are to be routed in such a cabin, each of then identified with a number from 0 to 99. The sources and destinations of the services are located as needed by the designer through the whole cabin (red and blue numbers/services in the figure, respectively).

  • Five obstacles (walls) obstructing the routes are given (light blue shapes in the figure). They consist of metal slices of 10 units width and can be traversed through 88 holes/windows (light orange squares in the figure).

  • The minimum distance between consecutive elbows is assumed to be 5050 units, as required by the designer.

  • The radii of the cylindrical pipes are 5050, 7575 and 100100 units and the minimal security distance among two pipelines is 5050 units.

As already mentioned, each edge in the generated grid for the instance, has an associated cost that allows to evaluate the feasible routes to be traced in the network. The cost system incorporates the preferences of the designer when routing the pipelines. We consider an additive cost structure for the objective function to model the use of edges and elbows in the route of each commodity with the following shape:

cek=(α1k+α5kPre)de+α2kEle+α3kHe+α4kChe+α6kPce+α7kCle,c_{e}^{k}=(\alpha_{1}^{k}+\alpha_{5}^{k}Pr_{e})d_{e}+\alpha_{2}^{k}El_{e}+\alpha_{3}^{k}H_{e}+\alpha_{4}^{k}Ch_{e}+\alpha_{6}^{k}Pc_{e}+\alpha_{7}^{k}Cl_{e},

for each edge ee and each service kk. In this function there are some α\alpha-parameters affected by the characteristics of the edge. The criteria and parameters that define the cost system are detailed in Table 2. This cost structure is flexible enough to reflect most the preferences of naval designers, and was determined in view of the criteria exposed by our partner company for the selection of implementable solutions.

Criteria Description
ded_{e} physical distance between end-nodes ii and jj of edge e={i,j}e=\{i,j\} (length of the edge).
EleEl_{e} 1 if edge ee represents an elbow and 0 otherwise.
He=MHheH_{e}=MH-h_{e} being MHMH the maximum height of the ship cabin and heh_{e} the height of edge ee in case it is in a plane parallel to the XYXY-plane and 0 otherwise.
CheCh_{e} 1 if edge ee is a vertical edge (in the ZZ-axis) and 0 otherwise.
PrePr_{e} 1 if edge ee belongs to a preference zone and 0 otherwise.
PcePc_{e} 1 if edge ee crosses a penetrable zone and 0 otherwise.
CleCl_{e} 1 if edge ee represents an elbow and it is close to a source or a destination point and 0 otherwise.
Parameters Description
α1k\alpha_{1}^{k} Cost per unit length.
α2k\alpha_{2}^{k} Cost of an elbow.
α3k\alpha_{3}^{k} Cost of moving away from the ceiling.
α4k\alpha_{4}^{k} Cost of changing in z-coordinates (height). Therefore, moving to a different height is penalized.
α5k\alpha_{5}^{k} Bonus per routing the pipeline in a preference zone (α5k<0\alpha_{5}^{k}<0; α1k+α5k>0\alpha_{1}^{k}+\alpha_{5}^{k}>0).
α6k\alpha_{6}^{k} Cost of crossing a penetrable zone.
α7k\alpha_{7}^{k} Cost of locating an elbow close to the source or destination point of a pipeline.
Table 2. Criteria and parameters involved in the cost function of the case study
Example 3.

In order to illustrate the above cost function, we use the part of the graph drawn in Figure 8.

Π2\Pi_{2}Π1\Pi_{1}v2v_{2}v1v_{1}
Figure 8. Graph used to illustrate the cost function in Example 3

In this graph, Π1\Pi_{1} is the plane {(x,y,z):z=1}\{(x,y,z):z=1\} while Π2={(x,y,z):z=0}\Pi_{2}=\{(x,y,z):z=0\} and then, plane Π1\Pi_{1} is closer to the ceiling than plane Π2\Pi_{2}. We denote by v1v_{1} and v2v_{2} the nodes which are virtualized in the figure (for each of the hyperplanes). We assume that there is a preference zone using Π1\Pi_{1} but there are no preference zones using Π2\Pi_{2}. Furthermore, v2v_{2} is assumed to be close to the source or destination point of some service and also that the black edge in Π2\Pi_{2} crosses a penetrable zone for the service. In this situation, we have:

  • The criteria dd and ElEl coincide for all the edges that belong to the planes Π1\Pi_{1} and Π2\Pi_{2}, being the part of their costs affected by parameters α1\alpha_{1} and α2\alpha_{2}, the same.

  • The height of the edges in Π1\Pi_{1} is larger than height of the edges in Π2\Pi_{2}, being the term α3H\alpha_{3}H smaller for the edges in Π1\Pi_{1}.

  • The criterion PrPr affects the edges in Π1\Pi_{1} but not those in Π2\Pi_{2}.

  • The criteria PcPc and ClCl affect some of the edges in Π2\Pi_{2} but none of those in Π1\Pi_{1}.

  • The edges linking nodes in Π1\Pi_{1} with nodes in Π2\Pi_{2} (parallel to the ZZ-axis) are only affected by criteria dd and ChCh.

In Table 3 we summarize the cost function for edges in the different planes depicted in Figure 8.

Virtual Arcs (Elbows) Non Virtual Arcs (Straight Pipes)
eΠ1e\in\Pi_{1} α2k\alpha_{2}^{k} (α1k+α5k)de+α3kHe(\alpha_{1}^{k}+\alpha_{5}^{k})d_{e}+\alpha_{3}^{k}H_{e}
eΠ2e\in\Pi_{2} α2k+α7k\alpha_{2}^{k}+\alpha_{7}^{k} α1kde+α3kHe\alpha_{1}^{k}d_{e}+\alpha_{3}^{k}H_{e}
α1kde+α3kHe+α6k\alpha_{1}^{k}d_{e}+\alpha_{3}^{k}H_{e}+\alpha_{6}^{k} (penetrable edges)
e parallel to ZZ-axis α1kde+α4k\alpha_{1}^{k}d_{e}+\alpha_{4}^{k}
Table 3. Illustration of the cost function

In the actual instance considered in the case study, each edge in the graph G~\widetilde{G} has the same cost for all services, i.e., cek=cekc_{e}^{k}=c_{e}^{k^{\prime}}, for all k,kKk,k^{\prime}\in K, as required by our partner company. The parameters provided for this instance were:

α1\alpha_{1} α2\alpha_{2} α3\alpha_{3} α4\alpha_{4} α5\alpha_{5} α6\alpha_{6} α7\alpha_{7}
1 2800 700 200 -0.7 4000 3000

and the preference zones were defined as the following parallelepipeds: [154241,158844]×[535,1419]×[24249,25221] and [152013,154241]×[535,3371]×[24249,25221].[154241,158844]\times[535,1419]\times[24249,25221]\text{ and }[152013,154241]\times[535,3371]\times[24249,25221].

We run our model for this instance with the exact and the different heuristic approaches. A time limit of 12 hours was fixed for all the procedures. The exact branch-and-cut approach was not able to find a feasible solution of the problem within the time limit. Note that the number of variables for this problem is 28194802819480 and the (initial) number of constraints is 3101428031014280 (constraints (Dist{\rm Dist}) and (ElbowR{\rm Elbow-R}) that are added as lazy constraints in the branch-and-cut approach are not counted here). The number of explored nodes after 12 hours was 18041804, which gives an idea of the high computational load required to solve the problem at each node of the branch-and-bound tree.

For the dimensionality reduction matheuristic (H1), we first solve, independently, the multicommodity flow problem with additional (ElbowR{\rm Elbow-R}) constraints for each single service, and restrict the search region of our problem to the region induced by these paths enlarged by a parallelepiped of dimension δk=max{Rk+Δk:kK}\delta_{k}=\max\{R^{k^{\prime}}+\Delta^{k^{\prime}}:k^{\prime}\in K\} around the paths. The value of δk\delta_{k} is sequentially enlarged by 0.10.1 units until a feasible solution is obtained. This procedure obtains a solution in 132.37132.37 seconds, and the last problem explored 1804118041 nodes in the branch-and-bound tree. The number of variables of this problem was 473292473292 (16.78%16.78\% of the variables of the exact approach) and the initial number of constraints was 807657807657 (2.6%2.6\% of the number of constraints required in the exact approach). The number of lazy constraints added in the branch-and-cut approach was 4080040800 (1212 of them of type (ElbowR{\rm Elbow-R})). The objective value of the solution was 448690.78448690.78.

For the decomposition based heuristic (H2) we fix to 10 the maximum number of iterations with the first 10%10\% of them of type I_par, the next 20%20\% of type I_cluster and the last 70%70\% of type I_seq. This configuration was adequately tuned using a simplified instance for the problem as a training sample. This heuristic computed a solution in 94.5494.54 seconds after 66 iterations and the obtained objective value was 433387.86433387.86. Observe that the deviation between the solutions obtained with the two heuristics was 3.41%3.41\%.

We draw in Figure 9 the obtained solution (with heuristic H1) as paths in the graph. In the picture we represent the obtained paths without (left) and with obstacles and holes (right). The obtained solution as actual pipelines is drawn in Figure 10. One can observe from the picture that real-world instances require routing intricate pipelines avoiding obstacles and respecting the space between the pipes what really makes difficult to locate them in the cabin. The heuristic approaches produce, in view of the results obtained with the synthetic instances, good quality solutions in reasonable CPU times, providing the naval designer with a powerful decision-aid tool for this task.

Refer to caption
Refer to caption
Figure 9. Graphical display of the solution for the case study with 10 services. In the left it is shown the solution without showing the obstacles. The figure on the right shows the same solution integrated within the set of obstacles in the scenario.
Refer to caption
Refer to caption
Figure 10. Graphical display of the solution for the case study with 10 services actual pipelines. In the left it is shown the set of pipelines without showing the obstacles. The figure on the right shows the same solution integrated within the set of obstacles in the scenario.

6. Conclusions

This paper develops a general methodology for the optimal automatic network design of different commodities incorporating real-world constructability conditions. This methodology was originated by an actual problem consisting of the design of spatial pipelines with ships cabins motivated by a recent collaboration with the company Ghenova, a leading naval engineering company. Our proposal is to adapt an ‘ad hoc’ minimum cost multicommodity network flow model to the problem that includes all the technical requirements of feasible pipelines routing. The large number of variables and constraints of real-sized instances makes it inappropriate (impossible in real-world instances) to load into the solver the complete model so that we implemented a branch-and-cut algorithm, where, initially only the standard multicommodity flow model is considered and additional technical constraints are separated within the branch-and-bound tree as lazy constraints. On top of that, we also develop two heuristic algorithms that provide rather good feasible solutions. The first one is a matheuristic based on solving trimmed instances and the second one is a decomposition heuristic that iteratively solves shortest path problems with modified edges weights. Our computational results on randomly generated instances are rather promising showing that we can solve to optimality medium-sized instances. We also report a case study based on a realistic naval instance of a ship cabin provided by our partner company to our research group to test the methodology.

Future work on this topic includes the consideration of more general underline networks including non-orthogonal designs which are conceptually easy to handle once the admissible solutions graphs are generated whereas the generation of these graphs is still a challenging question that will be the focus of a follow up paper.

We will also explore the use of Machine Learning tools to determine, in advance, the parameters of the cost function, that are assumed in this paper to be given by the designer. The study of the subregions of α\alpha-parameters inducing the same routes will allow us to provide the designers different options of reasonable parameters to explore in the decision making process.

Acknowledgements

The authors of this research acknowledge financial support by the Spanish Ministerio de Ciencia y Tecnologia, Agencia Estatal de Investigacion and Fondos Europeos de Desarrollo Regional (FEDER) via project PID2020-114594GB-C21. The authors also acknowledge partial support from projects FEDER-US-1256951, Junta de Andalucía P18-FR-422, CEI-3-FQM331, NetmeetData: Ayudas Fundación BBVA a equipos de investigación científica 2019, and Contratación de Personal Investigador Doctor (Convocatoria 2019) 43 Contratos Capital Humano Línea 2. Paidi 2020, supported by the European Social Fund and Junta de Andalucía.

References

  • [Ando and Kimura, 2011] Ando, Y. and Kimura, H. (2011). An automatic piping algorithm including elbows and bends. In International Conference on Computer Applications in Shipbuilding (ICCAS), pages 153–158, Triestre, Italy.
  • [Asmara, 2013] Asmara, A. (2013). Pipe routing framework for detailed ship design. PhD thesis, Delft University of Technology, Netherlands.
  • [Asmara and Nienhuis, 2006] Asmara, A. and Nienhuis, U. (2006). Automatic piping system in ship. In International Conference on Computer and IT Applications (COMPIT), Delft, Netherlands.
  • [Cuervas et al., 2017] Cuervas, F., Tordera, A., Fontán, A., Brenes, P., Alejo, C., Tovar, A., Puerto, J., Conde, E., Ortega, F., and Hinojosa, Y. (2017). Ariadna: sistema automático de trazado de tuberías y canalizaciones en ingeniería. Ingeniería Naval, 963:75–84.
  • [Dijkstra, 1959] Dijkstra, E. W. (1959). A note on two problems in connexion with graphs. Numerische mathematik, 1(1):269–271.
  • [Even et al., 1975] Even, S., Itai, A., and Shamir, A. (1975). On the complexity of time table and multi-commodity flow problems. In 16th Annual Symposium on Foundations of Computer Science (sfcs 1975), pages 184–193. IEEE.
  • [Guiradello and Swaney, 2005] Guiradello, R. and Swaney, R. S. (2005). Optimization of process plant layout with pipe routing. Computers and Chemical Engineering, 30:99–114.
  • [Hightower, 1969] Hightower, D. (1969). A solution to line routing problems on the continuous plane. In Proceedings of Sixth Annual Design Automation Conference. IEEE, pages 1–24.
  • [Ikehira et al., 2005] Ikehira, S., Kimura, H., and Kajiwara, H. (2005). Automatic design for pipe arrangement using multi-objective genetic algorithms. In International Conference on Computer Applications in Shipbuilding (ICCAS), pages 97–110, Busan, Korea, 23-26 August.
  • [Ito, 1999] Ito, T. (1999). A genetic algorithm approach to piping route planning. Journal of Intelligence Manufacturing, pages 103–114.
  • [Kim et al., 2013] Kim, S. H., Ruy, W. S., and Jang, B. S. (2013). The development of a practical pipe auto-routing system in a shipbuilding cad environment using network optimization. Int. J. Naval Archit. Ocean Eng., 5:468–477.
  • [Kimura, 2011] Kimura, H. (2011). Automatic designing system for piping and instruments arrangement including branches of pipes. In International Conference on Computer Applications in Shipbuilding (ICCAS2011), volume 3, pages 93–99.
  • [Lee, 1961] Lee, C. Y. (1961). An algorithm for path connections and its applications. IEEE Transactions on Electronic Computers, 10(3):346–365.
  • [Min et al., 2020] Min, J., Ruy, W., and Park, C. (2020). Faster pipe auto-routing using improved jump point search. International Journal of Naval Architecture and Ocean Engineering, pages 596–604.
  • [Mitsuta et al., 1986] Mitsuta, T., Kobayashi, Y., Wada, Y.and Kiguchi, T., and Yoshinaga, T. (1986). A knowledge-based approach to routing problems in industrial plant design. In Proceedings of the Sixth International Workshop Expert System and Their Applications, pages 237–256, Avignon, France, March.
  • [Newell, 1973] Newell, R. G. (1973). Algorithms for the design of chemical plant layouut and pipe routing. PhD thesis, Imperial College, London, England.
  • [Park, 2002] Park, J. (2002). Pipe-routing algorithm development for a ship engine room design. In Ph.D. Washington University.
  • [Park and Storch, 2002] Park, J. H. and Storch, R. L. (2002). Pipe-routing algorithm development: case study of a ship engine room design. Expert Systems with Applications, 23:299–309.
  • [Qian et al., 2008] Qian, X., Ren, T., and Wang, C. (2008). A survey of pipe routing design. In Control and Decision Conference, Chinese IEEE, pages 3994–3998, Yantai, Shandong, China, 2-4 July.
  • [Rourke, 1975] Rourke, P. W. (1975). Development of a three-dimensional pipe routing algorithm. PhD thesis, Lehigh University.
  • [Salimifard and Bigharaz, 2020] Salimifard, K. and Bigharaz, S. (2020). The multicommodity network flow problem: state of the art classification, applications, and solution methods. Operational Research.
  • [Schmidt-Traub et al., 1999] Schmidt-Traub, H., Holtkötter, T., Lederhose, M., and Leuders, P. (1999). An approach to plant layout optimization. Chemical Engineering Technology, 22(2):105–109.
  • [Shing and Hu, 1986] Shing, M. T. and Hu, T. C. (1986). Computational complexity of layout problems. In Layout design and verification, pages 267–294. Elsevier Science Publishers B.V., North Holland.
  • [Singh and Cheng, 2021] Singh, J. and Cheng, J. (2021). Automating the generation of 3d multiple pipe layout design using bim and heuristic search methods. In 18th International Conference on Computing in Civil and Building Engineering. ICCCBE 2020, volume 98, pages 54–72.
  • [Xiaoning et al., 2006] Xiaoning, F., Yan, L., and Zhuoshang, J. (2006). The ant colony optimization for ship pipe route design in 3d space. In World Congress on Intelligent Control and Automation (WCICA), pages 3103–3108, Dalian, China, 21-23 June.
  • [Xiaoning et al., 2007] Xiaoning, F., Yan, L., and Zhuoshang, J. (2007). Ship pipe routing design using the aco with iterative pheromone updating. Journal of Ship Production, 23(1):36–45.
  • [Zhu and Latombe, 1991] Zhu, D. and Latombe, J. (1991). Pipe routing-path planning (with many constraints). In IEEE International Conference on Robotics and Automation (ICCAS), pages 1940–1947, Sacramento, California.

Appendix A Pseudocode of the algorithms described in Section4

We gather in this section the pseudocode of the different algorithms described in Section 4 devoted to our matheuristic algorithms.

A.1. Pseudocode for the dimensionality reduction algorithm in Section 4.1

Next, we include the pseudocode of the dimensionality reduction algorithm.

input :  Initial set of candidate zones provided by user {Init-solk}kK.\{{\rm\texttt{Init-sol}}_{k}\}_{k\in K}.
{δk=Rk+Δk}kK\{\delta_{k}=R^{k}+\Delta^{k}\}_{k\in K} initial dimension of the parallelepiped around the best path for commodity kk.
it==1. stop=0stop=0.
1
2for kKk\in K do
3       Solve the Multicommodity Flow Problem with additional (ElbowR{\rm Elbow-R}) constraints for the single commodity kk in the whole graph GG: {pathk}kK\{{\rm path}_{k}\}_{k\in K}
4      
5
6while stop=0stop=0 do
7      
8      Solve (PRPS{\rm PRPS})(it), where all variables xijkx_{ij}^{k} for a given service kk, that are outside Initsolk{\rm Init-sol}_{k} union with the parallelepiped of dimension δk\delta_{k} around pathk{\rm path}_{k}, are fixed to zero.
9      if (𝑃𝑅𝑃𝑆{\rm PRPS})(it) is feasible then
10             stop=1stop=1
11      else
12             Increase δk\delta_{k} for all kk in KK
13      it==it+1
14
output : Solution of (PRPS{\rm PRPS})(it)
Algorithm 1 Dimensionality reduction algorithm.

A.2. Pseudocode for the decomposition-based algorithm described in Section 4.2

In the following we describe the different modules of the decomposition-based matheuristic.

input : stop:=0stop:=0 (termination criterion); it=0 (iterations counter); {1,,maxit}\{1,\ldots,maxit\} = I_parI_seqI_cluster\texttt{I\_par}\cup\texttt{I\_seq}\cup\texttt{I\_cluster} (Index ser for iterations); K0K_{0} (sorted set of all services in KK).
1
2while stop=0stop=0 and it\texttt{it}\leq maxit do
3       if itI_seq\texttt{it}\in\texttt{I\_seq}  then
4             Kit=K0K_{it}=K_{0} and K¯=K0\bar{K}=K_{0}.
5      for kKitk\in K_{it} do
6             Apply the SSP_Pipe_Elbow_Test to kk. (Algorithm 3)
7             Update Covering_List(kk). (Algorithm 4)
8             if itI_seq\texttt{it}\in\texttt{I\_seq} then
9                   K¯=K¯{k}\bar{K}=\bar{K}\setminus\{k\}. For all kK¯k^{\prime}\in\bar{K}, slightly increase the cost of edges linking vertices in Covering_List(kk).
10            
11      for kKitk\in K_{it} and kKk^{\prime}\in K do
12             Compute Cov(k,k):=\texttt{Cov}(k,k^{\prime}):=Covering_List(kk)\capCovering_List(kk^{\prime}).
13      if  Cov(k,k)\texttt{Cov}(k,k^{\prime})\neq\emptyset for some pair (k,k)(k,k^{\prime}), kKitk\in K_{it}, kKk^{\prime}\in K then
14             stop=0stop=0.
15             if itI_par\texttt{it}\in\texttt{I\_par} then
16                   For all service kKitk\in K_{it}, increase the cost (to the most costly service) of edges linking vertices in kKCov(k,k)\bigcup_{k^{\prime}\in K}\texttt{Cov}(k,k^{\prime}).
17            if itI_cluster\texttt{it}\in\texttt{I\_cluster} then
18                   Kit+1=;K_{it+1}=\emptyset;
19                   Sort the services, k1k2kk_{1}\succ k_{2}\succ\cdots\succ k_{\ell} (by priority);
20                   if Cov(ki,kj)\texttt{Cov}(k_{i},k_{j})\neq\emptyset and kikjk_{i}\succ k_{j} then
21                         Kit+1=Kit+1{kj}K_{it+1}=K_{it+1}\cup\{k_{j}\}.
22                        
23                  For all service kKit+1k\in K_{it+1}, increase the cost (to the most costly service) of edges linking vertices in kKKit+1Cov(k,k)\bigcup_{k^{\prime}\in K\setminus K_{it+1}}\texttt{Cov}(k,k^{\prime}).
24            it=it+1\texttt{it}=\texttt{it}+1
25      else
26             stop=1stop=1
27      
28
Algorithm 2 Decomposition-based Algorithm.
input : N0:=skN^{0}:=s^{k} (source node for service kk); Nf:=tkN^{f}:=t^{k} (destination node for service kk); Pk=P_{k}=\emptyset (initial path for service kk); test:=1test:=1 (initial infeasibility test).
1
2while (test=1)(test=1) do
3       Pk:=PkSPP(N0Nf)P_{k}:=P_{k}\cup\mathrm{SPP}(N^{0}\rightarrow N^{f});
4       if (Elbow{\rm Elbow}) is verified by PkP_{k} then
5             test:=0test:=0 and return PkP_{k}
6      else
7             Identify previous node that has passed the elbow test: i0i_{0};
8            N0:=i0N^{0}:=i_{0};
9             Pk:=Pk\SPP(i0Nf)P_{k}:=P_{k}\backslash\mathrm{SPP}(i_{0}\rightarrow N^{f});
10             Increase the cost of the elbow not verifying the elbow test;
11      
12
Algorithm 3 SPP_Pipe_Elbow_Test.
input : PkP_{k}= path connecting source node sks^{k} and destination node tkt^{k}; Lk=PkL_{k}=P_{k} and δk=Rk+Δk\delta_{k}=R^{k}+\Delta^{k} (covering of the pipeline).
1 for v0Pkv_{0}\in P_{k} do
2       for vLkv\in L_{k} do
3             while  there exists a vertex vv^{\prime} adjacent to vv such that dvv0<δkd_{v^{\prime}v_{0}}<\delta_{k} and vLkv^{\prime}\notin L_{k}  do
4                   Lk=Lk{v}L_{k}=L_{k}\cup\{v^{\prime}\};
5                   go to line 2.
6            
7      
output : LkL_{k}.
Algorithm 4 Covering_List(kk).